Image
Execution period 2012 - 2013
Contractor Kozloduy NPP Plc.

UPDATING THE SECONDARY CIRCUIT THERMAL-HYDRAULIC MODEL FOR THE KOZLODUY NPP UNIT 6 FULL-SCOPE REPLICA CONTROL ROOM SIMULATOR

The thermal-hydraulic model was updated by including a model of the separation system of the second steam extractor of turbine К-1000, as well as a model of the new "chamber-type" High Pressure Feedwater Heater (HPFWP), and upgraded model of the High Pressure Deaerators.

The project’s purpose was to develop new physical models of high pressure deaerators, regenerative high pressure heaters with new structure, and moisture separators of the second 

Back to all projects