Image
Execution period 2007 - 2008
Contractor Kozloduy NPP Plc.

UPGRADING THE KOZLODUY NPP UNIT 6 FULL-SCOPE REPLICA CONTROL ROOM SIMULATOR WITH A MODEL OF THE OVATION COMPUTER INFORMATION SYSTEM (TURBINE CONTROL AUTOMATED SYSTEM, UKTS, CIS)

The purpose of the project was to bring the simulator in full compliance with the type and behavior of the prototype Unit after commissioning of the distributer digital control system Computer Information System Ovation®.

At the same time, the following tasks were set out: to enhance the simulation quality and the quality of the simulator’s operational features; to extend the capacities of the simulator in order to satisfy the user requirements to the training process or for other practical purposes; to provide for software and hardware for simulator’s further improvement, especially as regards to the new digital monitoring and control system to be implemented.

Stages: design documentation preparation; system set-up and software upload, system integration, and acceptance and takeover tests.

Back to all projects