Image
Execution period 2008 - 2009
Contractor Kozloduy NPP Plc.

UNIT 6 FULL SCOPE SIMULATOR MODERNIZATION - UNIFIED COMPLEX OF TECHNOLOGICAL FEATURES, AUTOMATED SYSTEM FOR TECHNOLOGICAL PROCESS CONTROL, AND COMPUTER INFORMATION SYSTEM (CIS)

The Unified Complex for Technological Features (UKTS), the Automated System for Technological Process Control, and the Computer Information System (CIS) were replaced within the framework of the KNPP Units 5&6 Modernization Program. As a result, the respective systems of the Full Scope Simulator were also changed to ensure compliance with the nuclear Power Units and to provide for the adequate training.

The Project duration was 18 months and it was completed in the spring of 2009.

Back to all projects