Execution period 2002 - 2014
Contractor Kozloduy NPP Plc.

KOZLODUY NPP UNITS 5&6 LIFETIME EXTENSION

The main purposes of this task are development of a set of organizational, engineering and methodical measures for Units 5 & 6 Lifetime Extension, ensuring compliance with the contemporary regulatory and engineering requirements for NPP in operation, justification of the timeframes and required measures on ensuring the lifetime of structures, systems and components (SSC) until current licenses expiry in 2017 for Unit 5 and 2019 respectively for Unit 6 and in perspective for long term operation for the follow-up 15 years for each unit.

 
Back to all projects