Execution period 2004 - 2007
Contractor Kozloduy NPP Plc.

INFORMATION SYSTEM DEVELOPMENT FOR OPERATIONAL ACTIVITIES MANAGEMENT

The decision for development and implementation of Integrated Information System for Operational Activities Management (IS OAM) in KNPP was taken in 2004 and the software solution was developed by Risk Engineering Ltd. and the software company Haemimont AD as subcontractor. 

IS OAM presents information to the consumers for the complete operational history for a piece of equipment including all planned and executed activities and design data only by referring to the equipment process designation.

The user has access to all technical specifications, information about the owner of that equipment and its location, repair works, spare parts replacement, equipment test performed, failures and defects found (including the precise circumstances under which this has happened as well as the event description), manufacturer data, control points, spare parts lists, design documentation, technical solutions, equipment lifetime, protections and interlocks, measured parameters, etc.

Back to all projects