Execution period 2010 - 2011
Contractor TPP Maritsa East 2 EAD

ESIGN, DISMANTLING, MOUNTING, TESTS AND COMMISSIONING OF 230 МW GENERATOR ТВВ-220Е

The engineering project for the total replacement of 215МW Generator No.8 by a new one of 230МW includes the following activities:

  • Design related to Electrical, Machine and Process, Civil Structural, I&C Parts and drafting and submittal of full scope documentation for the equipment, installation plans, schedules, instructions etc.;
  • Old equipment dismantling, foundation preparation for Generator No. 8 new equipment installation;
  • Plant Generator No. 8 installation, testing and startup, in accordance with the factory instructions and regulatory requirements.

The complex task performance is in conditions of constant coordination with the activities of other companies at the site and organization of the mutual activity of companies-subcontractors of Risk Engineering. Large scope engineering tasks were resolved including reconstruction and repair of all process systems related to generator’s operation.

Finally, generator No.8 power increase by 15МW and facility reliable performance was achieved.