Contract execution covers the following activities:
- Elaborating detailed design for existing AEC replacement by a new one;
- Procurement of new AEC and equipment according to approved detailed design;
- Dismantling works;
- Installation works – the excitation system configuration is kept the same (with direct current exciter), the possibility for manual generator excitation with shunt rheostat is kept; at the generator control panel – the control and display of the parameters and condition of AEC;
- Generator tests – static, running on idle and on load;
- Startup and checkout works and commissioning;
- Personnel Training.