Execution period 2012
Contractor TPP Maritsa East 2 EAD

DESIGN, PROCUREMENT, DISMANTLING, MOUNTING, TESTS AND COMMISSIONING OF EQUIPMENT COMPONENTS OF PLANT GENERATOR No. 7 WATER-HYDROGEN COOLING

It is an engineering project covering the activities as design, procurement, dismantling, mounting, and startup and checkout works related to Electrical, Machine and Process, and I&C Parts. It concerns full replacement of the equipment of the following components of Plant Generator No. 7 Water-Hydrogen Cooling:

  •  Gas post;
  •  Water and Hydrogen Cooling Facility;
  •  Valves for hydrogen and carbon dioxide trunk line;
  •  New stand for automatic analysis of hydrogen purity.

The design solutions, the equipment selected and the installation performance comply with the expectations of the Employer Maritsa East 2 TPP and are a good basis for the reliable operation of the generator cooling system, respectively for its work at nominal parameters.