Execution period 2011
Contractor TPP Maritsa East 2 EAD

DESIGN, PROCUREMENT, DISMANTLING, MOUNTING, TEST AND COMMISSIONING OF EQUIPMENT COMPONENTS FROM THE PLANT GENERATOR No. 5 WATER-HYDROGEN COOLING SYSTEM

The engineering project covers the activities on design, procurement, dismantling, installation, and startup and checkout works related to the Electrical, Machine and Process, and I&C Parts. It refers to the full replacement of the equipment of the following components of the Generator No. 5 water-hydrogen cooling:

  •  Gas post;
  •  Water and Hydrogen Cooling Facility;
  •  Valves for hydrogen and carbon dioxide trunk line;
  •  New stand for automatic analysis of hydrogen purity.

The design solutions, the equipment selected and the installation performance comply with the expectations of the Employer Maritsa East 2 TPP and are a good basis for the reliable operation of the generator cooling system, respectively for its work at nominal parameters.