Image
Execution period 2012
Contractor Boinica Municipality

DESIGN, CONSTRUCTION AND COMMISSIONING OF PHOTOVOLTAIC POWER PLANT “RABROVO"

Installed power: 0.5 MW

The construction of the Plant includes the installation of 1 728 pieces of photovoltaic panels (Monocrystalline, 300 Wp) on static metal structures, on the area of 8.9 dca. The panels are connected to 16 pieces of string inverters (3-phase, 30kW). The “Rabrorvo" PPP is connected to the power distribution network through a new cable line 20 Kv with a length of 0.35 km to the existing iron lattice pillar No. 13 of the Overhead 20 KV transmission line “Kraishte”. In addition, the necessary electrical facilities have been constructed on the territory of the Plant: a transformer substation (type BKTP – Unit Switchgear Set Transformers, 630kVA, 0.4/20kV).

A monitoring system has been introduced for the PPP operation in real-time, thereby providing monitoring of a number of main technical parameters. A thorough analysis of the operation of the plant shall be made based on the incoming information and, if necessary, the trained personnel available shall undertake adequate measures to remove possible defects or accidents. The on-site security system includes: physical security, 24-hour video surveillance, security lighting and perimeter security for the entire length of the safety fence of the Plant by a sensor optical cable.

Back to all projects