Execution period 2005 - 2006
Contractor National Electric Company Ltd.

CONSTRUCTION AND INSTALLATION WORKS AND START-UP AND ADJUSTMENT WORKS FOR THE TELEMECHANIZATION OF SIX SITES OF NEK EAD

The task included the development of detailed designs as per the technical requirements, delivery and installation of the remote control instrumentation, putting the system into operation, connection to the secondary commutation circuits to ensure telesignalization, telemonitoring, and telemetering; delivery and installation of measuring transducers, and equipment for main and backup power supply to the Remote Control System.

Back to all projects