Execution period 2005 - 2006
Contractor TPP Maritsa East 2 EAD

CONCEPTUAL AND DETAILED DESIGN DEVELOPMENT FOR BOILER No.3 AND 4 CONTROL ROOMS REHABILITATION

The task is developed in two stages - conceptual and detailed design.

At the conceptual design phase, decision was taken not to include the current mnemonic diagram as the stop valves position is displayed both in Unit 2 control system and the control panels.

The detailed design includes drawings of the modified electric actuators that are not included in I&C Part of Unit 2 original design and changes done during the operations. The design includes the changed dimensions of the existing control rooms and creates more comfortable workplaces for the operators.

Back to all projects